eLcahillneteLearning cost & timeline estimator
Planning estimate · not a black box

What will your eLearning project really take?

Build a transparent estimate for labor, budget, and calendar time. Every Cahill planning heuristic is editable and disclosed in the report; external benchmarks remain directional evidence, not market quotes.

Private: inputs stay in this browserPlanning and contingency scenariosEditable assumptions shown in the report

1. Scope the learning

Finished duration matters, but module count and the type of work matter too. An 80-minute course is not automatically equivalent to eight 10-minute modules.

Examples: $, €, £, USD
min
Finished learning: · Project and module setup are estimated separately.

2. Set the production profile

Choose the closest overall experience. The benchmark is a starting point; project-condition adjustments keep it from pretending that duration is the only driver.

An effort allowance does not establish WCAG conformance; testing against applicable success criteria is still required.
Benchmark and advanced production assumptions
:1
hrs
hrs
Cahill planning heuristics — editable model values

These are illustrative house assumptions, not published industry standards. Edit them to match your environment. A factor of 1.00 makes no adjustment.

Model componentValueApplied as
New buildcore factor
Existing-training conversioncore factor
Existing-course refreshcore factor
Approved contentcore factor
Structured contentcore factor
Rough SME contentcore factor
Research/content creationcore factor
Inclusive baselinecore factor
Enhanced WCAG effortcore factor
Regulated/high assurancecore factor
Each review round after 2% core
Each active reviewer after 1% core
SCORM testing + base hrs + hrs/module
xAPI/cmi5 + base hrs + hrs/module
Custom/LTI integration + base hrs + hrs/module
Added-person efficiency% capacity per added person
Benchmark sources: ATD 2017 and the Chapman table reproduced by Learning Guild. WCAG conformance requirements: W3C WCAG 2.2.

3. Model an AI-assisted scenario

This is a scenario, not a guaranteed saving. Use a net reduction after prompt preparation, human review, quality control, and rework.

Use AI-assisted scenario as the headline estimateThe report still compares both scenarios.
%
Anything above 30% should be treated as an aggressive public-planning assumption.

4. Add production costs and capacity

Media and localization remain separate so they are not silently counted twice inside the development ratio.

$/hr
%
hrs
workdays
$

Media, SME time, and localization

min
hrs
hrs
min
$
%
hrs
$/hr
% core
%
Video rates exclude talent, travel, studio, stock, music, captions, and other hard costs unless entered under vendor costs.